Nature and city come together around the cherry blossom park. On completion of the project, the cherry blossom park will be directly connected to Donaufelder Strasse to the north and Tokiostrasse to the west for pedestrians. The development of the park through public passageways from north-south/east-west will significantly improve the living situation of all neighbouring residents. A total of three buildings will be constructed. Two buildings with around 250 owner-occupied flats will be built in a quiet location, secluded from all roads and directly adjacent to Kirschblütenpark, while one building along Donaufelder Strasse is planned with compact rental flats.
Status: completed
Performance period: 2017 - 2021
Client: ZIMA Wien GmbH
Services: Preliminary design to final design